How much labor should be estimated to install the 54 straps?

Prepare for the Construction Documentation Test with detailed questions and explanations. Master key concepts with study resources and deepen your understanding of construction documentation to excel in your exam!

To determine the correct amount of labor estimated for the installation of 54 straps, it is important to understand the units of measurement typically used in construction labor estimation, such as man-hours required for the task. The correct answer signifies that the estimate of 9.7 man-hours reflects an analysis based on factors such as the complexity of the installation process, the number of straps to install, and the average time it takes a skilled worker to complete each installation for similar tasks.

This figure can result from previous project data, taking into account any necessary planning, preparation, and follow-up work associated with the installation of the straps. If this estimate has been derived from a well-documented schedule or historical performance data, it establishes a credible benchmark translating to the task at hand.

Other options may not align with standard practices and historical data for similar installation work, either underestimating or overestimating the time needed. This highlights the importance of experience and accurate record-keeping in labor estimation for construction tasks.

Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy